Why Air Barrier Testing Matters
Air barrier performance affects energy efficiency, moisture management, and long-term enclosure durability. As codes continue to reference tighter air leakage thresholds, testing plays a larger role in confirming that the design intent has been met in the field.
According to Henry® air and vapor barrier experts, the following represent the most common tests used by consultants, inspectors and building enclosure consultants to evaluate air barrier materials and assemblies.
Substrate Acceptability and Field Readiness for Air Barrier Installation
Substrate readiness is the first step in air barrier performance. Installers and inspectors verify that sheathing, framing, and transitions are secure, free of damage and free of gaps or voids. Wood substrates should have moisture content below 20 percent. There is no universal moisture limit for gypsum sheathing or concrete, but these materials must be dry to the touch and free of negative side moisture such as flooding at the base of the wall or migrating from the interior. Installation should not begin until the substrate is acceptable.
There is no ASTM standard that defines substrate acceptability for air barrier installation. Substrate readiness is a field-based evaluation guided by project specifications, manufacturer requirements, and industry best practices. Project teams typically verify moisture content with handheld meters for wood and gypsum, while concrete and masonry are evaluated for surface dryness and signs of moisture. This confirmation helps prevent adhesion issues and reduces the risk of future performance problems.
Pull Adhesion Testing (ASTM D4541) for Air Barrier Bond Strength
This destructive test measures bond strength between the membrane and the substrate. A metal disc is adhered to the surface and pulled off with a calibrated device. Results are reported in pounds per square inch. Many projects reference minimum target values, but the test is most useful as a diagnostic tool to understand substrate integrity, adhesive cure, and installation technique. Environmental conditions and test execution can influence results, which is why this evaluation is recommended early in the installation sequence.
Air Leakage Site Detection (ASTM E 1186) for Identifying Air Barrier Gaps
Known as the bubble gun or smoke pencil test, this diagnostic method identifies leakage sites while the assembly is under a pressure difference. It does not quantify leakage. Instead, it locates discontinuities at joints, penetrations, and transitions. Project teams use this test before whole building or assembly testing to resolve issues and reduce the possibility of retesting. It is also useful after a failed test to pinpoint leakage locations.
Assembly Air Leakage (ASTM E783) for Wall Air Barrier Performance
This test measures the air leakage rate of a defined wall area placed under a static pressure difference. Current energy codes require an air barrier assembly leakage rate not greater than 0.04 cfm per square foot at 1.57 psf. Although many fully adhered membranes can achieve this threshold when installed correctly, projects that specify tighter performance may require enhanced detailing. Testing is often performed on early mockups so that installation techniques can be refined before full production.
Water Penetration Testing (ASTM E1105) Under Wind-Driven Rain Conditions
Water penetration testing evaluates how the assembly performs under wind-driven rain conditions. A spray rack applies continuous water while the assembly is held at a specific pressure difference. Typical conditions include two hours at 6.24 psf. Projects in high-wind regions may add a short-duration test at higher pressure. Water testing is one of the most demanding evaluations because small discontinuities can allow water intrusion. Early mockup testing helps the team refine transition details and correct deficiencies before installation progresses across the project.
Whole Building Air Leakage (ASTM E779) for Enclosure Air Tightness
Whole building testing measures the total leakage rate of the constructed enclosure. One or more blower doors depressurize the building while airflow is recorded. Codes generally require leakage no greater than 0.4 cfm per square foot at 1.57 psf. Because this test occurs late in construction, identifying and repairing leaks is more challenging. It is most effective when combined with a project-wide quality control program focused on continuity of the air barrier.
Assembly Testing for Durability (ASTM E2357) for Air Barrier System Performance
This laboratory method evaluates complete air barrier assemblies before and after structural loading, pressure cycling, and thermal conditioning. It provides a picture of how membranes, penetrations, and terminations perform together under stress. ABAA and ASHRAE reference a maximum leakage rate of 0.2 L/s·m² at 75 Pa for assemblies that have passed this test.
Material Air Permeance (ASTM E2178) for Air Barrier Material Classification
This test measures the air permeance of individual air barrier materials. Many codes and standards define an air-impermeable material as one with permeance less than 0.004 cfm per square foot at 1.57 psf. Material performance helps specifiers evaluate membrane suitability before the product is integrated into assemblies.
Schedule a Project Review With an Air Barrier Specialist
If you would like support selecting air barrier testing strategies or reviewing project-specific requirements, schedule a meeting with a Henry® building science specialist. Our team can help interpret test results, review detailing approaches, and support the development of a coordinated air barrier plan for your next project.
Connect With Us On Your Next Project
Choosing Henry's integrated solutions ensures peace of mind through continuous, compatible systems that are well-designed, thoroughly tested, and backed by comprehensive support. Our approach guarantees a high-performing, durable, and efficient building envelope. Contact us today to discuss how we can help with the design of your next project.